Case Study - Warehouse Building

  • Writer: TreisTek
    TreisTek
  • Jul 27, 2021
  • 1 min read

Project Title: Warehouse Building

Location: Europe

Project Duration:600 hours

As-Built Model: LOD 400

We have created a highly accurate & detailed MEPF (mechanical, electrical, plumbing) model by considering coordination for the project. Effective clash detection during the coordination process provided valuable insights for designers to make the necessary changes. We have also coordinated with the client’s BIM management team and created parametric families.


Input: CAD 2D Plans

Output: 3D MEPF Model

TreisTek’s Solutions:

MEPF Co-ordination and MEPF Modeling Clash Detection


Results:

  • Developed MEPF model along with MEPF coordination and clash detection

  • Guaranteed on-time delivery by dedicating separate teams and resources.

  • Avoid discrepancies in the modeling process by developing a smooth workflow and level of detail.

  • Provide progress reports as per the requirement to ensure the accurate delivery of models in line with the clients’ requirements.

  • Providing separate resources and tools for quality checks.